Design your deck

Design your deck

Drag the handles, move the stairs, pin notes. No account needed.

Pin a note anywhere: a door, a tree, a hot tub spot.
House wall, ledger board16 ft12 ft
192 sq ft, 42 in off the ground. Boards run along the house. 2x8 joists at 16 in on center (longest span 10 ft 6 in), 1 beam line in green plus the ledger, posts 7 ft apart or less. Drag the round handles to change the size. Drag the stairs to where they should land. A starting sketch for builders, who confirm framing and footings on site.
Furniture add as many as you like, then drag them into place
Board direction along the house
Railing
Projected materials list

21 items, about 192 sq ft of deck

CheckedItemQuantity
Framing
Joists, 2x8 (13 joists at 16 in o.c., longest 12 ft)172 lin ft
Rim joists, 2x8 (Around the open edges)44 lin ft
Ledger board, 2x818 lin ft
Ledger flashing18 lin ft
Beams, 2x12 (3-ply 2x12, 16 ft at 10 ft 6 in out)53 lin ft
Posts, 6x6 × 8 ft (3 posts, 7 ft apart or less)24 lin ft
Footings
Footing forms, 12 in3
Concrete, 80 lb bags (3 footings, 12 in × 36 in deep)12
Hardware
Post bases3
Beam-to-post connectors3
Joist-to-beam ties13
Joist hangers at the ledger13
Ledger screws (2 per 16 in)24
Lateral load tension ties (DCA 6 lateral load connection)2
Decking
Decking (pressure-treated) (26 rows along the house, 10% waste)458 lin ft
Deck screws (2 per board per joist)710
Stairs
Stair stringers, 2x12 × 8 ft (6 risers, 5 treads, 4 ft wide)32 lin ft
Stair treads (2 boards each)44 lin ft
Landing pad concrete4
Railing
Railing (Metal balusters) (Open sides minus the stair opening)36 lin ft
Stair railing13 lin ft
  • Joists 2x8 at 16 in o.c.; longest span 10 ft 6 in (allowable 12 ft 6 in, IRC R507.6 for #2 DF/HF/SPF), 1 ft 6 in cantilever past the outer beam.
  • 1 beam line plus the ledger; beam sizes are rule-of-thumb from the depth each carries. Check them against IRC R507.5 or DCA 6.
  • Footings 12 in diameter, 36 in deep; your jurisdiction sets frost depth.
  • Quantities include 10% waste on lumber and decking. Fasteners for connectors are not itemized.

Quantities include typical waste. A starting point: the builder confirms everything on site, and prices are theirs.

Denver: a building permit is likely needed

It's 42 in off the ground; permits start at 30 in.

Guidance from published rules; the building department decides.

192 sq ft rectangular deck

Request quotes